Last updated: September 2026
The SAP procurement technology stack has three layers. SAP Ariba, SAP Business Network and SAP Fieldglass handle sourcing, supplier collaboration and services buying in the cloud. S/4HANA handles purchasing inside your ERP. Around both sit the enabling tools: BTP for integration, Signavio for process insight, WalkMe for adoption, Joule for AI and Business Data Cloud for analytics.
Most procurement leaders do not have a technology problem. They have a boundary problem. Two systems can raise a purchase order, two can hold a contract, and nobody can say which one is the master. That ambiguity is what turns an eighteen-month programme into a three-year one.
This article maps every component in SAP's procurement portfolio, says plainly what each one owns, and shows where the overlaps are. It then covers the four decisions those overlaps force, and what the 2026 changes to SAP's product line mean for a roadmap you may have written in 2024. Over the past fifteen years our team has delivered SAP procurement programmes across the UK and the Middle East, and the sequencing advice here comes from that work.
What is the SAP procurement technology stack?
The SAP procurement technology stack is the set of SAP products that together run source-to-pay: SAP Ariba for sourcing, contracts and buying, SAP Business Network for supplier transactions, SAP Fieldglass for external labour, S/4HANA for ERP-side purchasing, and a supporting layer of BTP, Signavio, WalkMe, Joule and Business Data Cloud.
SAP groups these commercially under "intelligent spend management", and since Sapphire in May 2026 has increasingly used the phrase "autonomous spend management" for the AI-led version of the same portfolio [1]. Both terms appear on SAP's own materials, and SAP has not said the older one is retired.
| Component | What it owns | Overlaps with |
|---|---|---|
| SAP Ariba | Strategic sourcing, contracts, guided buying, requisition to invoice, supplier lifecycle, direct materials collaboration | S/4HANA for transactional buying |
| S/4HANA procurement (MM) | Purchase requisitions and orders tied directly to inventory, finance and goods receipt | Ariba Buying and Invoicing |
| S/4HANA Central Procurement | One purchasing experience across several back-end ERPs | Ariba, and the old SRM footprint |
| SAP Business Network | Supplier-facing document exchange: orders, invoices, order collaboration, discovery | Nothing. It is the network layer beneath Ariba |
| SAP Fieldglass | Contingent workers, statements of work, services procurement | Ariba, where services sit close to goods |
| SAP Signavio | Process mining and modelling across P2P and S2P | Spend analytics, on the diagnosis side |
| WalkMe | In-application guidance and adoption across any of the above | Training, and Joule's contextual help |
| SAP BTP | Integration, extensions and the platform next-generation Ariba is built on | Any custom development you already run |
| Joule and Joule agents | AI assistance and agent actions inside the applications | Nothing. It is a layer, not a process owner |
| Business Data Cloud | The data and analytics substrate, absorbing Datasphere and Analytics Cloud | Ariba Spend Analysis and Insights |
| Ariba Spend Analysis and Insights | Spend classification, benchmarking and savings identification | Signavio, on the measurement side |
Straight answer: almost nobody needs all eleven. A mid-market manufacturer with one ERP and 400 suppliers may need S/4HANA procurement, Business Network and nothing else. The stack is a menu, and SAP's account teams do not always present it that way.
Do you need SAP Ariba if you already have S/4HANA?
Not always. S/4HANA procurement handles requisitions, purchase orders, goods receipt and invoice verification natively, tied straight into inventory and finance. You need Ariba when you need capabilities S/4HANA does not have: competitive sourcing events, a contract repository with obligation tracking, catalogue-driven guided buying, structured supplier lifecycle management, or collaboration with suppliers outside your four walls.
The clearest way to decide is to ask three questions in order.
- Does the work happen outside your organisation? Sourcing events, supplier onboarding, supplier risk and invoice exchange all involve parties who will never have an S/4HANA login. That is Ariba and Business Network territory.
- Do you have more than one ERP? If purchasing is spread across several back ends, S/4HANA Central Procurement gives you one buying experience over all of them. This is the capability that inherited the ground SAP SRM used to hold [2].
- Is the requirement really about buying, or about control? Approval routing, budget checks and three-way match are ERP strengths. Category strategy, negotiation and supplier performance are not.
Common mistake: buying Ariba Buying and Invoicing and S/4HANA self-service procurement at the same time, then deciding later which one raises the requisition. Pick the master before the design workshop, not during user acceptance testing. This single decision is the one we spend most time on at the start of a SAP procurement engagement, because everything downstream inherits it.
What changed in the SAP procurement stack during 2026?
Three things changed, and all three affect roadmaps written before 2026: SAP rebuilt Ariba on BTP, shipped AI agents into procurement workflows, and reorganised its analytics products.
The Ariba rebuild. SAP announced next-generation SAP Ariba at SAP Connect in October 2025 [3], shipped the technical foundation in the 2602 release in February 2026, and made its public announcement on 12 March 2026 [4]. It is the same suite rebuilt on SAP Business Technology Platform, with a unified data layer, a Fiori-based interface and open APIs. Releases now come quarterly, in February, May, August and November [5].
Migration is voluntary. SAP has published no deprecation date for the current generation, existing customers can run both environments in parallel, and SAP states the move requires no new licence [4]. We cover the migration decision in detail in our guide to next-generation SAP Ariba.
Joule agents. At Sapphire in May 2026 SAP named eleven Joule assistants spanning category management, sourcing, supplier management, contracts, requisitioning, buying, receiving, invoicing, services procurement, travel and expense [1]. Agents for intake management, contracts and Fieldglass services procurement reached general availability in June 2026 [6][7], with a further wave through September.
Watch the date: SAP does not publish list prices, and the pricing model for agent actions is described only by third-party licensing advisers, not by SAP itself. Treat any figure you read for AI unit consumption, including the widely repeated claim that agent runtime is free until the end of 2026, as unconfirmed until it appears in your own contract.
The analytics reshuffle. SAP Datasphere and SAP Analytics Cloud are being consolidated into SAP Business Data Cloud. Separately, SAP Ariba Spend Analysis and Insights became available on 16 September 2026, pulling spend data from Ariba, Fieldglass, Concur, Cloud ERP and non-SAP sources into one classification and benchmarking layer [8]. If your roadmap names Datasphere as the spend analytics destination, it needs revisiting. Our earlier piece on building an AI-ready data foundation still holds on principles, but the product names have moved.
What is SAP Business Network, and what happened to Ariba Network?
SAP Business Network is the renamed Ariba Network. The change took effect with the Ariba 2302 release, and SAP's own documentation records the rename [9]. It is the multi-enterprise layer where your suppliers receive orders, send invoices, confirm shipments and maintain their profiles.
The distinction that matters: Ariba is what your buyers use, Business Network is what your suppliers use. You license them separately, and your suppliers may carry their own fees depending on transaction volume. Published supplier fee schedules describe a subscription tier plus a transaction fee as a percentage of transacted value, with an annual cap per buyer relationship, but SAP's own pricing pages are not publicly accessible, so confirm the current schedule with SAP directly before you tell suppliers what they will pay.
From delivery: supplier fees are the single most common reason a supplier enablement wave stalls. Raise it in the first supplier communication, not the third. A supplier who discovers a fee after go-live becomes an escalation; one who knew in advance becomes a participant.
Where does SAP Fieldglass fit?
SAP Fieldglass manages external workforce and services procurement: contingent workers, statements of work, time capture, and the onboarding and offboarding of people who are not your employees. Ariba buys goods and defined services. Fieldglass buys capacity and outcomes delivered by people.
For UK organisations Fieldglass carries a compliance dimension that has grown since April 2026, when joint and several liability for PAYE and National Insurance failures in umbrella company arrangements began to reach agencies and end users [10]. Knowing exactly who is working for you, under which engagement model, through which intermediary, stopped being an administrative nicety.
What do Signavio and WalkMe actually do in a procurement programme?
Signavio tells you what your process really does. WalkMe makes people follow the process you designed. Neither runs a transaction, and both are routinely cut from business cases, which is why so many programmes go live and then quietly underperform.
SAP Signavio mines the event data your systems already record and shows the real path from requisition to payment: where approvals stall, how much spend bypasses contracts, which invoice exceptions repeat. An integration for pulling Ariba process data into Signavio Process Insights has been available since the May 2023 release [11]. Run it before the design phase and your target process is grounded in evidence. Run it after go-live and you have a benefits baseline.
WalkMe sits over the interface and guides users in the moment: which field, which catalogue, which approval. SAP acquired it for $1.5bn, agreeing the deal in June 2024 at $14.00 per share and completing in September 2024 [12][13]. In procurement its value is narrow and real, concentrated in guided buying, supplier onboarding and invoice exception handling, which are exactly the tasks occasional users perform badly.
Cost reality: SAP publishes no list price for either product. Both are quoted on user and module counts. Budget for them at the business case stage or they will be cut at the point in the programme when they are most needed.
How does SAP BTP hold the stack together?
SAP BTP is the integration and extension platform underneath the rest of the stack, and since the 2026 rebuild it is also the platform next-generation Ariba runs on. Its Integration Suite carries the traffic between Ariba, Business Network and your ERP, including requisitions, purchase orders, order confirmations, advance shipping notices, goods receipts and invoices.
Two practical implications:
- Integration is a design decision, not a plumbing task. The managed gateway that connects spend management to your ERP has been through naming and packaging changes, and SAP's own community material is not always current. Confirm the exact service and its entitlement position with SAP before you architect around a name you read in a blog.
- Extensions belong outside the core. Custom fields and logic built on BTP survive upgrades in a way that modifications inside the application do not. This matters more now: organisations moving to next-generation Ariba have to review existing customisations for compatibility with the BTP-based architecture. Our piece on moving from monolith to SAP BTP covers the pattern in more depth, and BTP-side build work sits within our application development practice.
What does the SAP procurement stack cost?
SAP publishes no list prices for any component of this stack. Every figure in circulation comes from licensing advisory firms reconstructing deals, and the spread is wide: roughly $10,000 to $30,000 a year for small deployments, $80,000 to $300,000 for a core module, and $400,000 upwards for a full source-to-pay suite. Implementation is commonly quoted at 20% to 40% of first-year software cost.
Treat those as orientation, not budget. Three things move the number far more than the headline licence:
| Cost driver | Why it moves the number |
|---|---|
| Managed spend and document volume | Ariba commercials key off spend under management and document counts, so a high-volume, low-value category profile prices very differently from a small number of large contracts |
| Number of integrations | Each additional back-end system, tax engine or e-invoicing provider adds build and test effort, and integration is usually the longest lead item in the plan |
| Supplier enablement scale | Onboarding 2,000 suppliers is a programme in its own right, with its own communications, testing and support load |
Cost reality: the cheapest way to get this wrong is to scope the licence carefully and the enablement casually. In most programmes we see, the supplier-side effort is underestimated by a wider margin than any other line.
What must the stack do for UK buyers?
For UK organisations, and public sector bodies in particular, the stack has to produce evidence, not just transactions. Four obligations shape the design.
- Procurement Act 2023, in force since 24 February 2025, moved publication and transparency to the centre of the regime. Notices, contract details and supplier information flow through the Central Digital Platform, and suppliers on below-threshold public contracts have had to register on it since April 2026 [14].
- Payment transparency. Contracting authorities publish payment data for contracts over £30,000 on a quarterly cycle. This is a reporting requirement your ERP has to satisfy, and most standard reports do not produce it out of the box.
- PPN 026, the new Social Value Model, published on 5 August 2026, applies to central government contracts of £1m and above. From 1 January 2027 the jobs and skills theme carries a 10% weighting below £5m and 20% at £5m and above [15]. Social value stops being a bid narrative and becomes data you have to capture, evaluate and then evidence through delivery.
- E-invoicing. The UK has confirmed Peppol as the network for its mandate, with B2B and B2G e-invoicing becoming mandatory in April 2029 [16][17]. That is far enough away to ignore and close enough that any integration you design in 2026 should assume it.
If your organisation sells into the UK public sector, or buys as part of it, these four turn "which system holds the contract" into a compliance question rather than a preference.
What must the stack do in Saudi Arabia and the UAE?
In the Gulf, compliance deadlines drive the stack harder than procurement strategy does, and the dates are close.
Saudi Arabia. ZATCA's Phase 2 e-invoicing programme continues in waves, with Wave 24 covering taxpayers above SAR 375,000 in turnover and an integration deadline of 30 June 2026 [18]. A new Government Tenders and Procurement Law was approved in August 2026 and published in Umm Al-Qura on 4 September 2026, taking effect 120 days after publication, which places it in early January 2027 [19]. Local content obligations under LCGPA continue to tighten for government tenders. Data residency also became a genuine differentiator: SAP announced in October 2025 that Saudi Arabia was the first country to host SAP Business Network for the public sector in-Kingdom, on Google Cloud, with full data sovereignty compliance [20].
United Arab Emirates. The UAE is implementing e-invoicing on a Peppol five-corner model. A voluntary pilot opened in July 2026, businesses above AED 50m in revenue were required to appoint an accredited service provider by 30 October 2026, with mandatory operation from 1 January 2027 and smaller businesses following in July 2027 [21].
Watch the date: these dates have moved more than once, and the UAE service provider deadline was itself an extension. Confirm each one against ZATCA, the Saudi Ministry of Finance and the UAE Federal Tax Authority before you commit a programme plan to it. Our SAP implementation and transformation work in the region now treats the e-invoicing integration as a critical path item rather than a downstream task.
How should you sequence the decisions?
Sequence around the immovable dates first, then the architecture, then the tooling. For most organisations the immovable date is not an Ariba decision at all. SAP ECC mainstream maintenance ends on 31 December 2027, with extended maintenance available to 2030 at a premium [22].
That deadline is closer than the industry's behaviour suggests. A DSAG survey published in February 2026 found around half of ECC users planning to migrate by the end of 2030, only 37% targeting the end of 2027, and 66% naming data migration as their main obstacle [23].
A workable order of decisions:
- Fix the ERP date. Your S/4HANA position dictates everything else. Our S/4HANA migration roadmap sets out the options, and the migration itself sits in our advance SAP transformation practice.
- Decide the procurement operating model. Central Procurement, Ariba, or both, and which one owns the requisition.
- Map the compliance deadlines that apply in each country you operate in, and treat them as fixed.
- Diagnose the current process with Signavio before designing the target one.
- Then choose the AI scope. Agents applied to a broken process automate the breakage.
Common mistake: running an Ariba migration and an ECC-to-S/4HANA migration as two independent programmes with two steering committees. They compete for the same integration specialists and the same testing windows. Sequencing them is a programme management problem before it is a technical one.
Ready to work out which parts of this stack you actually need? Talk to our SAP procurement team.
What this looks like in delivery
These are composite scenarios drawn from common delivery patterns, not individual named clients.
A UK manufacturer running ECC across four plants
Four plants, four ways of raising a purchase order, and a 2027 deadline. The instinct is to buy the full suite and standardise everything at once. The workable path is narrower: fix the S/4HANA target first, use Central Procurement to give the four plants one buying experience, and bring in Ariba only for the categories where competitive sourcing and supplier collaboration actually pay. Process mining before design usually shows that a large share of spend never goes through a sourcing event at all, which changes what is worth licensing.
A Gulf government-linked entity with a ZATCA integration requirement
Here the compliance date sets the plan. The e-invoicing integration has to clear before the wave deadline, which means the invoice flow between Business Network, the ERP and the clearance platform is designed and tested first, and the sourcing and contracts scope follows. Data residency questions come up early with this type of organisation, and in-Kingdom hosting for the network layer changes what is possible.
A multi-country group with one ERP and three compliance regimes
UK, Saudi and UAE entities on a single ERP, with three different e-invoicing futures and three sets of local content or social value obligations. The mistake is building one integration and localising it later. The pattern that holds is a common document model with country-specific clearance and reporting at the edge, so a change in one regime does not trigger a retest of all three.
Where to start
If you take one thing from this, make it the boundary decision. Most SAP procurement programmes that go badly were unclear about which system owned which document, and no amount of AI tooling compensates for that.
A practical first month:
- List every place a requisition, purchase order or contract can be created today. The number is usually higher than expected.
- Fix your S/4HANA position and date. Everything else sequences behind it.
- Run a process diagnostic on requisition to payment, so the target design starts from evidence.
- Build the compliance calendar for every country you buy in, with each date traced to its primary source.
- Only then decide the module and AI scope, and separate what you need at go-live from what can follow.
If you want a second opinion on a roadmap that was written before the 2026 changes, our team works on exactly this sequencing question across the UK and the Middle East. Talk to us about your procurement roadmap.
Frequently Asked Questions
What is the SAP procurement technology stack?
It is SAP's set of procurement products working together: SAP Ariba for sourcing, contracts and buying, SAP Business Network for supplier transactions, SAP Fieldglass for external labour, S/4HANA for ERP-side purchasing, and BTP, Signavio, WalkMe, Joule and Business Data Cloud as the supporting layer. Most organisations use a subset, not all of it.
Do I need SAP Ariba if I have S/4HANA?
Only if you need what S/4HANA does not do: competitive sourcing events, contract lifecycle management, guided buying from catalogues, structured supplier lifecycle management, or collaboration with suppliers outside your organisation. For internal requisition-to-order flows tied to inventory and finance, S/4HANA procurement alone can be enough.
Is SAP Ariba being discontinued?
No. SAP rebuilt Ariba on SAP Business Technology Platform and announced the result in March 2026. The current generation continues to be supported, migration is voluntary, both environments can run in parallel, and SAP has announced no end-of-support date for the classic environment.
What is the difference between SAP Ariba and SAP Business Network?
Ariba is the application your buyers use for sourcing, contracts and buying. SAP Business Network is the supplier-facing layer where your suppliers receive orders, send invoices and maintain their profiles. Business Network is the renamed Ariba Network, changed with the 2302 release.
What replaced SAP SRM?
SAP SRM's ground is now covered by S/4HANA Central Procurement for operational buying across multiple back-end systems, and by SAP Ariba for strategic sourcing and supplier network capability. Many organisations end up with a combination rather than a single replacement.
What is S/4HANA Central Procurement?
It is a hub that gives you one purchasing experience across several back-end ERP systems, so requisitions and purchase orders can be raised centrally and executed in the connected systems. It suits groups that have not consolidated onto a single ERP.
Where does SAP Fieldglass fit in the stack?
Fieldglass handles contingent workforce and services procurement: temporary workers, statements of work, time capture, onboarding and offboarding. Ariba covers goods and defined services, so the split is usually drawn around whether you are buying a deliverable or a person's capacity.
What does SAP Signavio do for procurement?
Signavio mines the data your systems already record and shows how your procurement process actually runs: where approvals stall, how much spend bypasses contracts, and which invoice exceptions repeat. A connector for pulling Ariba process data into Signavio Process Insights has existed since the May 2023 release.
Why would a procurement programme need WalkMe?
WalkMe provides in-application guidance at the moment of use, which matters most for occasional users doing guided buying, supplier onboarding or invoice exception handling. It addresses the gap between the process you designed and the process people follow after training ends.
How much does SAP Ariba cost?
SAP does not publish list prices. Licensing advisory firms report ranges from roughly $10,000 to $30,000 a year for small deployments up to $400,000 and beyond for a full source-to-pay suite, with implementation commonly quoted at 20% to 40% of first-year software cost. Your actual price depends on managed spend, document volume and module scope, so treat published ranges as orientation only.
Do suppliers pay to use SAP Business Network?
Some do. Published fee schedules describe a subscription tier plus a transaction fee based on transacted value, with an annual cap per buyer relationship and a threshold below which no fee applies. Because SAP's pricing pages are not publicly accessible, confirm the current schedule with SAP before communicating anything to your suppliers.
What are Joule agents in procurement?
Joule agents are SAP's AI agents embedded in procurement workflows, able to carry out tasks such as analysing supplier bids, routing intake requests and assisting with contract creation. SAP named eleven Joule assistants across the spend lifecycle at Sapphire in May 2026, with agents for intake management, contracts and Fieldglass services procurement reaching general availability in June 2026.
What is SAP Ariba Spend Analysis and Insights?
It is a spend analytics application that became available on 16 September 2026, unifying and classifying spend data from SAP Ariba, Fieldglass, Concur, Cloud ERP and non-SAP sources, with AI-driven insight on savings opportunities.
What happened to SAP Datasphere for spend analytics?
SAP Datasphere and SAP Analytics Cloud are being consolidated into SAP Business Data Cloud, which is now the data and analytics substrate beneath SAP's applications. If your roadmap names Datasphere as a destination, revisit the product naming with SAP.
When does SAP ECC support end?
Mainstream maintenance for SAP ECC ends on 31 December 2027, with extended maintenance available until 31 December 2030 at an additional premium. For procurement teams this is usually the date that sequences every other decision.
How long does an SAP procurement implementation take?
It depends almost entirely on scope, the number of integrations and the scale of supplier enablement, rather than on the software itself. A single-module deployment into one ERP is a different order of work from a multi-country source-to-pay programme with thousands of suppliers to onboard, which is why any timeline quoted before a scoping exercise should be treated sceptically.
Does the SAP procurement stack handle ZATCA e-invoicing in Saudi Arabia?
SAP customers in Saudi Arabia meet ZATCA Phase 2 obligations through integration between their ERP, the clearance platform and their document flows, with waves continuing through 2026 and beyond. The integration design is specific to your estate, so treat it as a critical path item rather than a configuration setting.
Is SAP Business Network hosted inside Saudi Arabia?
SAP announced in October 2025 that Saudi Arabia was the first country to host SAP Business Network for the public sector in-Kingdom on Google Cloud, with full data sovereignty compliance. Confirm current availability for your sector and entity type directly with SAP, as the private-sector position has been announced separately.
What does the UK Procurement Act 2023 require from a procurement system?
It requires publication and transparency rather than any particular product: notices and contract information through the Central Digital Platform, quarterly publication of payments on contracts over £30,000, and from January 2027 evidence against the PPN 026 social value themes. Your system has to produce that data reliably, which standard reports often do not.
When does UK e-invoicing become mandatory?
The UK has confirmed Peppol as the network for its e-invoicing mandate, with B2B and B2G e-invoicing becoming mandatory in April 2029. Integration designed in 2026 should assume it rather than retrofit it.
Should we move to next-generation SAP Ariba now?
It depends on how much you have customised. Organisations with light customisation and a strong interest in the new AI capabilities have a reason to move early. Those with heavy extensions and integrations built on the classic architecture have a reason to wait, because feature parity is still arriving and SAP has set no deadline.
References
- [1] SAP News Center. "Autonomous spend management" framing and the eleven Joule assistants, announced at SAP Sapphire, May 2026. news.sap.com
- [2] Industry analysis of SAP SRM successor paths to S/4HANA Central Procurement and SAP Ariba. consilio-gmbh.de; e3mag.com
- [3] SAP News Center. Next-generation SAP Ariba announced at SAP Connect, October 2025. news.sap.com
- [4] SAP News Center. "Next-Gen SAP Ariba: The Foundation for Intelligent Procurement", 12 March 2026. news.sap.com
- [5] SAP Community. SAP Ariba quarterly release cadence and release previews. community.sap.com
- [6] SAPinsider. SAP delivers Joule agents across Ariba and Fieldglass, June 2026. sapinsider.org
- [7] ERP Today. Joule agents for Ariba and Fieldglass procurement automation, 2026. erp.today
- [8] SAP News Center. "SAP Ariba Spend Analysis and Insights Now Available", 16 September 2026. news.sap.com
- [9] SAP Help Portal. Ariba Network renamed to SAP Business Network, from release 2302. help.sap.com
- [10] UK umbrella company PAYE reform: joint and several liability for agencies and end clients from 6 April 2026. gtlaw.com; bdo.co.uk
- [11] SAP Community. SAP Signavio Process Insights integration for SAP Ariba, May 2023 release. community.sap.com
- [12] SAP News Center. SAP enters agreement to acquire WalkMe, June 2024. news.sap.com
- [13] SAP News Center. SAP completes WalkMe acquisition, September 2024. news.sap.com
- [14] GOV.UK. Procurement Act 2023, Central Digital Platform factsheet and guidance. gov.uk
- [15] GOV.UK. PPN 026: The Social Value Model, published 5 August 2026. gov.uk
- [16] Peppol confirmed as the interoperability network for the UK e-invoicing mandate, June 2026. peppol.org
- [17] UK mandatory B2B e-invoicing from April 2029. vatcalc.com
- [18] ZATCA. Phase 2 e-invoicing integration waves, including Wave 24 (turnover above SAR 375,000, deadline 30 June 2026). zatca.gov.sa
- [19] Saudi Arabia's new Government Tenders and Procurement Law, published in Umm Al-Qura 4 September 2026, effective 120 days after publication. twobirds.com; gtlaw.com; mof.gov.sa
- [20] SAP News Center MENA. Saudi Arabia first to host SAP Business Network for the public sector with full data sovereignty compliance, October 2025. news.sap.com/mena
- [21] UAE e-invoicing: Peppol five-corner model, accredited service provider deadline 30 October 2026, mandatory operation from 1 January 2027. avalara.com; Ministerial Decisions 243 and 244 of 2025
- [22] SAP Support Portal. Product availability strategy: ECC mainstream maintenance to 31 December 2027, extended maintenance to 2030. support.sap.com
- [23] DSAG member survey on ECC migration plans, February 2026, reported by The Register and CIO.com
Written by
Acmatic SAP Practice
Senior practitioners across SAP, AI compliance, supply chain, and procurement.